PRODUCT EDUCATION
This is the Hanyang Robotics curriculum guide.
We will do our best to provide our customers with the high-quality training they need.
Name
Mold management
Main point
Quality of production molds, initial and final production
Education list
1. Presence or absence of mold nameplate, presence or absence of RFID
2. Whether mold is painted or not, locating ring present or not
3. Mold anti-opening plate present or not
4. Cleanliness of mold fixing plate
5. Fitting line and ejector pin vent condition
6. GAS VENT CORE Status
7. GUIDE PIN / BUSH Status by Mold
8. Slide Core Guide Status
9. Angler pin state, in-row block state
10. Ejector pin condition
11. Three plate mold parting lock condition
12. With and without push plate limit switch
13. Mold Temperature Management
14. Mold cooling line scale cleaning available or not
15. Manage SPRUE BUSHING
16. Manage the position of the ejector rod
17. Management of foreign substances in mold part
18. Preheat management of mold exchange
19. FLASH Phenomenon Management by Mold
20. Daily mold repair target management
21. Management of mold repair history
targets
more than 3 years of injection molding experience, Injection molding and mold engineer
Period
2days 14hours
Cost
Free